Commercial Solar Case Studies.
All the latest commercial solar projects carried out by Activ8 Solar Energies across Ireland
Commercial Solar
Commercial Solar Panels.
Ballyjamesduff, Co. Cavan

System Size | 4.4 MWp

Number of panels | 6,640

Installation Time | 23 Weeks
Marston, United Kingdom

System Size | 3.3 MWp

Number of panels | 5,772

Installation Time | 18 weeks
Liverpool, United Kingdom

System Size | 3 MWp

Number of panels | 4,312

Installation Time | 26 weeks
Burnley, Lancashire, UK

System Size | 2.7 MWp

Number of panels | 5 933

Installation Time | 14 weeks
Kingscourt, Co. Cavan

System Size | 2.5 MWp

Number of panels | 3,556

Installation Time | 24 weeks
Naas, Co. Kildare

System Size | 2.3 MWp

Number of panels | 4,021

Installation Time | 6 Weeks
Clonmel, Co. Tipperary

System Size | 1.6 MWp

Number of panels | 2869

Installation Time | 8 Weeks
Grannagh, Co. Waterford

System Size | 1.2 MWp

Number of panels | 2,959

Installation Time | 16 Days
Hatfield, Hertfordshire, UK

System Size | 2009 kWp

Number of panels | 6 379

Installation Time | 14 Weeks
Burnley, Lancashire, UK

System Size | 1,127kWp

Number of panels | 2 254

Installation Time | 12 Weeks